Completed in Malaysia in 2024, this 126 m² PAC cleanroom provides an ISO 8 environment for biopharmaceutical applications.
Completed in Malaysia in 2024, this 126 m² PAC project provided an ISO 8 environment for biopharmaceutical operations. The client required clean space that could be prepared as modules and installed quickly after delivery. A prefabricated cleanroom configuration was chosen, with the walls, ceiling, HVAC, filtration, lighting, electrical services, automation, and monitoring coordinated as one package. The cleanroom wall panels formed part of the pre-assembled enclosure, while module installation, commissioning, and validation completed the site scope. The recorded lead time was two months. This modular cleanroom example shows how PAC delivery can suit a mid-sized controlled area where transport and on-site connections can be planned in advance. The published case does not identify the client or give process-specific equipment details. It also does not claim measured performance beyond the ISO 8 classification stated in the project information.
Create approximately 126 m² of ISO 8 biopharmaceutical clean space with pre-assembled modular delivery and rapid site installation.
Pre-assembled PAC cleanroom modules provided 126 m² of ISO 8 space for biopharmaceutical use in Malaysia.
El paquete del proyecto se coordinó como un sistema completo, manteniendo alineadas las interfaces arquitectónicas, mecánicas y de control desde el diseño hasta la cualificación.
Comparta sus requisitos de proceso, clasificación y calendario. Nuestro equipo le recomendará el enfoque PAC o SAC adecuado.